Mamre Road upgrade

The NSW Government has committed $248 million to Mamre Road upgrade between the M4 Motorway, St Clair and Erskine Park Road, Erskine Park

Latest news

SEP 2021

SEP 2021Online Info Sessions

We have held the first of our two online information sessions. A link to the recording of this session will be made available on this webpage following the second session.

Our second Information session will be held Monday 20 September at 4pm.

To attend, please view this link when the session is due to start or at any time after 4pm.

The event will run for 1 hour. No registration is required and you do not need to download Microsoft Teams to watch or participate. During this session you can find out more about the proposal from the project team and ask questions.

We encourage you to submit your questions in advance using the chat.

AUG 2021

AUG 2021Have your say on the Review of Environmental Factors

Transport for NSW has developed a Review of Environmental Factors (REF) for the proposed upgrade of Mamre Road between the M4 Motorway, St Clair and Erskine Park Road, Erskine Park. View or download the August Community Update (PDF, 14Mb).

The planning documents are available in both PDF format which can be downloaded from the project documents below as well as digitally in an interactive online platform located at nswroads.work/mamreroad1ref

We welcome all your feedback on the REF and you can have your say until midnight Sunday 26 September 2021.

You can make a submission using the interactive online platform or by contacting the project team by calling 1800 696 564, emailing mamreroadupgrade@transport.nsw.gov.au, or mailing Mamre Road upgrade, PO Box 973 Parramatta NSW 2124

Online information Sessions

In response to the evolving Coronavirus situation, Transport for NSW is following NSW Health advice and changing the way it approaches community consultation for important transport infrastructure projects. This means consultation will be carried out in different ways to limit the spread of Coronavirus and ensure the community can have their say.

We will hold online community information sessions via Microsoft Teams at the following times:

During these sessions you can find out more about the REF from the project team and ask questions. We encourage you to submit your questions in advance by emailing mamreroadupgrade@transport.nsw.gov.au or calling 1800 696 564

Project information

Mamre Road is an important transport corridor in the Western Parkland City and is a key connector to the Western Sydney Employment Area and Western Sydney Aerotropolis.

A strategic design and preferred option for upgrading Mamre Road between the M4 Motorway, St Clair, and Kerrs Road, Kemps Creek was displayed for community comment in 2017. The selection process used to determine the preferred option is available to view or download from the November 2017 Mamre Road upgrade options report (PDF, 2.92Mb). Feedback received was responded to in the April 2019 consultation report (PDF, 3.04Mb).

The NSW Government has committed $248 million to Mamre Road upgrade between the M4 Motorway, St Clair and Erskine Park Road, Erskine Park. The project has been fast tracked as part of the NSW Governments Jobs and Infrastructure Acceleration Fund. Geotechnical investigations, utility surveys and ground surveys for the project started in early 2020.

Further upgrades of Mamre Road would be delivered subject to funding.

We have developed a Review of Environmental Factors (REF) for the proposed Mamre Road upgrade between the M4 Motorway and Erskine Park Road. The REF outlines the preferred features of the concept design, assesses a range of environmental impacts expected during construction and when the upgraded road is operating, and how we plan to minimise these impacts on our community.

The REF can be viewed and downloaded from the project documents below or via an interactive digital platform.

 

Key features for the upgrade between the M4 Motorway and Erskine Park Road

  • Four lane divided road with a wide central median, allowing for six lanes in future if required.
  • Changes to six intersections on Mamre Road.
  • A new shared path along the eastern side of Mamre Road
  • Reinstating bus stops near Banks Drive with the capacity for additional bus infrastructure in the future.
  • Changes to property access for Mamre House and Erskine Park Rural Fire Service
  • Installing permanent noise walls along the eastern side of Mamre Road at St Clair.

At the end of the REF display period, a submissions report will be published on the website which summarises comments or questions received for the project and our responses.

We will keep community members and other stakeholders informed of progress throughout delivery of the project.

Construction for the upgrade between the M4 Motorway and Erskine Park Road is planned to start in 2022 and be completed by 2025.

Project documents

Reports

Show filesHide files
File Title Size
May 2019 community consultation report

Mamre Road upgrade.

3.04Mb
November 2017 options report

Mamre Road upgrade - Kerrs Road to M4 Motorway.

2.92Mb

Community updates

Show filesHide files
File Title Size
August 2021 community update 13.7Mb
March 2020 community update 439Kb
November 2017 community update

Mamre Road upgrade - M4 Motorway to Kerrs Road.

1.29Mb
May 2017 community update

Mamre Road Upgrade.

629Kb

 

Contact us

For more information about the project, please contact the project team.

Phone: 1800 696 564 (toll free) during business hours

Email: mamreroadupgrade@transport.nsw.gov.au

Mail: Mamre Road upgrade, PO Box 973 Parramatta NSW 2124