Wilfred Barrett Drive, Magenta and The Entrance North.

Wilfred Barrett Drive, Magenta and The Entrance North

Transport for NSW is improving safety between Wyuna Avenue and north of Pelican Beach Road.

Latest news

MAY 2021

MAY 2021Start of work

We are working between 7pm and 5am from Sunday to Thursday nights. Some work activities at the start of the project will be carried out between 7am and 5pm from Monday to Friday.

Work is expected to be competed in 12 months, weather permitting.

For more information and a copy of the final design please download the May 2021 project notification (PDF, 737Kb).

Project information

The NSW Government is investing in this project between Wyuna Avenue and north of Pelican Beach Road to improve safety and reduce crashes.

Transport will carry out the work along a four kilometre section of the road.

The project involves:

  • widening the road to provide a one metre wide central median and three metre southbound shoulders
  • providing right turn bays into Pelican Beach Road and the car park for Red Gum Trail walking track
  • installing safety barriers
  • installing audio-tactile line marking (rumble strips) which provides a noise and vibratory warning to a driver or rider who has drifted from their lane

Wide centreline

The introduction of a one metre wide centreline will improve safety by providing greater separation between vehicles travelling in opposite directions.

Audio-tactile line marking

The project incorporates audio-tactile line marking (ATLM) on the edge and centrelines of Wilfred Barrett Drive.

ATLM, sometimes called ‘rumble strips’ are small raised bumps typically placed along the edges of roads and in the centre of roads to alert a driver when they are drifting out of their lane.

Project documents

Project notifications

Show filesHide files
File Title Size
May 2021 project notification

Start of work - Safety improvements on Wilfred Barrett Drive, Magenta and The Entrance North.

737Kb

Media releases

Show filesHide files
File Title Size
11 June 2021

Safety work kicks off at Wilfred Barrett Drive

47.6Kb

 

Share this page: