Aerial view of The Northern Road - Stage 3

The Northern Road upgrade, Glenmore Parkway to Jamison Road

The Australian and NSW governments are upgrading The Northern Road as part of the Western Sydney Infrastructure Plan (WSIP), a $4.1 billion road investment program.

Latest news

JAN 2022

JAN 2022Work notifications

Night work on the M4 Motorway eastbound on-ramp – 17 to 21 January 2022

We need to temporarily close the M4 Motorway eastbound on-ramp to carry out maintenance and line marking work.

More information in the work notification (PDF, 183Kb).

JAN 2022

JAN 2022Works notifications

Night work on Glenmore Parkway – 10, 11 and 21 January 2022

We need to temporarily close a section of Glenmore Parkway between The Northern Road and Glengarry Drive to carry out maintenance work.

JAN 2022

JAN 2022Works notifications

Work continues along The Northern Road upgrade – January to March 2022

Completion work will take place along The Northern Road, local side streets and the M4 Motorway including on and off ramps.

DEC 2021

DEC 2021The Northern Road is open

The $1.6 billion Northern Road Upgrade between Narellan and South Penrith is officially open. The final stage of the upgrade between Littlefields Road and Glenmore Parkway was completed in November 2021 approximately a year ahead of schedule. Please view or download the December 2021 community update (PDF, 1.23Mb) for more information on each of the stages including their key features.

Project information

The Northern Road upgrade will deliver new and upgraded roads to support integrated transport in the region and capitalise on the economic benefits from developing the Western Sydney Airport at Badgerys Creek. It would also improve safety, increase road capacity and reduce congestion and travel times in the future.

This upgrade covers about 4 kilometres between Glenmore Parkway, Glenmore Park and Jamison Road, South Penrith. It is planned to generally follow the existing road alignment.

  • Contractor: Acciona (formerly Lendlease Engineering)
  • Start of major construction: mid-2017
  • Expected completion date: mid-2021
  • Project value (of all 6 sections of The Northern Road): $1.6 billion
  • Funding source: Australian and NSW governments

If you live along this route there may be changes to how you access your property. To see these changes, please visit our interactive portal.

The benefits of The Northern Road upgrade:

  • Improving travel times by:
    • Increasing the number of lanes along The Northern Road
    • Removing a set of traffic lights at the M4 Interchange
    • Providing additional turning lanes at some intersections
  • Allowing for reliable public transport by providing a continuous kerbside bus lane in each direction
  • Improving safety for pedestrians and cyclists by providing a new shared path
  • Improving connectivity for pedestrians by providing new footpaths
  • Improving road safety by:
    • Providing a central median to separate opposing traffic flows
    • Installing new traffic lights at two existing intersections
    • Providing separate turning lanes at some intersections
    • Improving the alignment of the road
  • Improving local access by providing an extension of Cross Road to Wentworth Road
  • Mitigating traffic noise impacts by providing two new noise barriers.

Key features of The Northern Road upgrade include:

  • Widening The Northern Road to provide four lanes in each direction (three general traffic lanes and a kerbside bus lane)
  • Building a new bridge over the M4 Motorway with the existing bridge to be removed
  • Installing new traffic lights and turning lanes at some intersections
  • Providing continuous bus lanes in each direction
  • Installing a central median
  • Providing a new shared pedestrian and cyclist path and footpaths
  • Installing new street lighting, drainage, safety barriers and landscaping
  • Installing new retaining walls
  • Installing two new noise barriers

Acciona (formerly known as Lendlease Engineering) is the major contractor responsible for delivering the four kilometres of The Northern Road between Glenmore Parkway, Glenmore Park and Jamison Road, South Penrith. Work started in mid-2017 and it is expected to be complete in 2021.

We will continue to provide updates to the community as the project progresses.

All feedback received during the display of the concept design and REF was considered by the project team. A submissions report is available for download that summarises the submissions received and the intended project outcome.

Cyclist detour map

Cycle Way Map

View or download a large version of The Northern Road cyclist detour map.

Media releases

Show filesHide files
File Title Size
December 2019

Plan ahead for closures along The Northern Road at South Penrith.

25.01Kb
November 2018

Work on The Northern Road upgrade drives ahead.

26.1Kb

 

Contact us

Construction contact

For construction information contact:

Phone: 1800 870 665

Email: tnr.community@acciona.com

WSIP contact

For further information about this project:

Contact us online

Phone: 1800 703 457 (toll free)

Email: thenorthernroad@rms.nsw.gov.au

Mail: PO Box 973 Parramatta CBD NSW 2124