Traffic on Box Road at the intersection

Intersection improvements at Princes Highway and Box Road, Sylvania

Transport for NSW’s Gateway to the South Pinch Points Program aims to ease congestion and improve journey reliability on Sydney’s key southern road and bus corridors. The program is linked to the NSW Government’s roadmap to deliver the state’s future transport network, the Future Transport Strategy 2056. This acknowledges the vital role transport plays in the land use, tourism and economic development of towns and cities.

Project information

Transport is undertaking improvements at the intersection of the Princes Highway and Box Road, Sylvania. The work on Box Road will involve road widening (within the road reserve) to provide turning lanes for improved access onto the highway, including a signalised pedestrian crossing across Box Road (east).

The proposed intersection improvements would reduce delays for bus customers and motorists, while improving safety and pedestrian access.

The intersection is serviced mainly by bus route 970 and also some local bus services.

To reduce delays and improve bus travel time reliability through the intersection, we are widening Box Road to the east and west of the intersection with the Princes Highway.

This will allow for new dedicated turn lanes to be provided, which will increase the capacity and efficiency of the intersection.

The project features:

  • A dedicated right turn, through and left turn lanes on the eastern approach to Box Road
  • A dedicated right turn bay on the western side of Box Road
  • Extend existing ‘no stopping’ zone on Box Road
  • Removal of two street trees
  • New signalised pedestrian crossing and relocating existing pedestrian crossings
  • Modification to service road access
  • Removal of speed camera and installation of CCTV.
  • Reduced congestion and more reliable travel times for buses and general traffic, particularly during peak periods.
  • Improved intersection capacity and efficiency with new right turn lanes on both sides of Box Road onto the highway and a new left turn lane on Box Road (east) onto the highway.
  • Improved travel time reliability for buses that travel through the intersection from Box Road (east) onto and off the highway.
  • Improved safety of the intersection for pedestrians, including a new signalised pedestrian crossing on Box Road (east) as well as improved access across the service road.

On 9 March 2020, following consultation with Sutherland Shire Council, Transport informed the community and key stakeholders about the proposed changes and asked for feedback by 6 April 2020. Feedback was invited by telephone, email or post.

Transport would like to thank everyone who provided feedback. After carefully considering it, we intend to proceed with the intersection improvements presented in March 2020, with some changes to the original proposal.

Changes to the original proposal, which follow discussion with Sutherland Shire Council are detailed in the Close of Engagement Report (PDF, 2.28Mb).

Work will commence 29 April 2021, until end 2021.

Transport will continue to keep the community updated as the project progresses.

Project documents

Community updates

Show filesHide files
File Title Size
April 2021 community update

Work starting on the upgrade of intersection at Box Road and Princes Highway, Sylvania.

547Kb
July 2020 community update

Intersection improvement update.

223Kb
March 2020 community update

Have your say.

1.53Mb

 

Contact us

To find out more about this project:

Email: projects@wardcivil.com.au

Phone: Our delivery partner, Ward Civil, 1800 897 841

Mail: Princes & Box Project Team, PO Box 973, Parramatta NSW 2124.

Share this page: