Panaromic view of the south side of the new Grafton Bridge (June 2018)
The first segment is lifted into place for the new Grafton Bridge (June 2018)
The placement of a segment coincided with a visit from Copmanhurst public school (July 2018)
Andrew Hart of RMS and community member Maxwell Lloyd
Placing primer ready for sealing on Clarence Street (August 2018)
Storing segments in the pre-cast yard (August 2018)
Stormwater main works underway on Pound Street at night (August 2018)
Sunrise over the pre-cast yard (August 2018)
Train passenger view of piling occurring for the new Pound Street rail bridge (August 2018)
Monitoring retaining wall, existing Pound Street rail bridge, after pile driving work (Sept 2018)
Aerial view of segments lined up at the Through Street pre-cast years (September 2018)
Tugboats return the Rebecca Lily barge to Grafton (September 2018)