Concrete pour underway for a pile for marine pier 6 (January 2018)
First segment poured at the pre-cast yard in Through Street (January 2018)
Paving trial underway on the roundabout to the east of Bunnings (January 2018)
Pier construction underway in the Clarence River (January 2018)
First segment poured at the pre-cast yeard in Through Street (January 2018)
Pier construction underway in the Clarence River (January 2018)
Concrete pour underway for a pile for marine pier 6 (January 2018)
Aerial view of construction underway on the Through-Iolanthe streets roundabout (February 2018)
Members of the Grafton Probus club prepare for a bridge tour with project team members (March 2018)
Preparations underway for the last pier skirt lift (March 2018)
Stormwater main installation in Pound Street (March 2018)
Presentation to the Grafton Chamber of Commerce (April 2018)
First concrete pour underway for a top section of a pier (May 2018)