Newell Highway Narrabri to Moree

Newell Highway Upgrade, heavy duty pavement upgrades (Narrabri to Moree)

The Australian Government has committed $205.73 million and the NSW Government has committed the remaining $51.44 million towards the $257 million Heavy Duty Pavement Upgrade (HDPU) project under the Newell Highway Upgrade program.
The HDPU project involves upgrades to four priority sections of the Newell Highway between Narrabri and Moree.

Information session

On Tuesday May 4 TfNSW held an online information session for local and indigenous suppliers and contractors to learn more about how they may be involved in upcoming opportunities in the delivery of the HDPU project. To view the session please click on the session link.

Latest news

MAY 2021

MAY 2021Background

The project includes upgrading four sections along the Newell Highway with approximately 27km of new road pavement, intersection improvements, widening of road shoulders and the provision of five new overtaking lanes. This will improve safety for motorists and reduce future maintenance requirements and costs.

Stimulus funding enabled early work to be completed in June 2020 consisting of water main relocations in Bellata.

Intersection upgrades map
Intersection upgrades map

Project information

The project includes planning for up to 32 kilometres of new road pavement, intersection improvements, widening of road shoulders and provision of five new overtaking lanes. This will improve safety for motorists and reduce future maintenance requirements.

A Review of Environmental Factors (REF) for the project has been completed and determined with the reports available for download in the project documents section of this page. As part of the development of the project ongoing investigations, including survey investigations, are being carried out to further develop and determine the project.

  • Increase travel reliability between Narrabri and Moree
  • Reduce travel times between Narrabri and Moree
  • Reduce the cost of maintenance along the Newell Highway
  • Reduce vehicle operating costs on the Newell Highway
  • Improve road safety for road users
  • Improve flood immunity of the Newell Highway between Narrabri and Moree.

The upgraded sections of the Newell highway between Narrabri and Moree would include:

  • provide a heavy duty pavement to meet the existing and future freight needs along this section of the  Newell
  • widen the existing highway or construct a new two lane highway adjacent to the existing highway of 3.5m lanes, 2m shoulders, and 1m wide centreline cross section
  • provide new 1.5km long dedicated overtaking lanes in five locations
  • upgrade intersections and right turning lanes
  • retain or improve the 110km design speed alignments
  • improve access to private property and bus stop layouts.

The Primary objectives are to:

  • increase travel reliability and reduce travel times on the Newell Highway
  • reduce vehicle operating costs on the Newell Highway
  • reduce the costs of maintaining the Newell Highway
  • improve freight efficiency
  • improve the safety of the Newell Highway (reduce fatalities and serious injury crash rate)

Other supporting objectives are to:

  • provide a 40year traffic loading design
  • develop a proposal that contributes to the economic development of the region and improves transport efficiency on this section of the Newell Highway in terms of travel time and vehicle operating costs
  • ensure that all potential impacts of the proposal on the local community are assessed and appropriate mitigation measures are developed
  • ensure an adequate level of service for existing and predicted traffic volumes
  • ensure route development minimises the impact on environmentally sensitive areas and that appropriate mitigation measures are included in the proposal to manage any impact
  • ensure stakeholder involvement in all phases of the proposal development
  • ensure compatibility of the road network and the long-term land use planning for the area.

Project documents

Community information

Show filesHide files
File Title Size
June 2018 project update

Newell Highway upgrade, Narrabri to Moree and North Moree heavy duty pavement projects.

260Kb

Reports

Show filesHide files
File Title Size
September 2018 submissions report

Newell Highway Heavy Duty Pavements, Narrabri to Moree.

10.3Mb
June 2018 review of environmental factors report

Executive Summary.

159Kb
June 2018 review of environmental factors report

Newell Highway Heavy Duty Pavements, Narrabri to Moree - Main report.

31.3Mb
June 2018 Biodiversity Assessment

Newell Highway Heavy Duty Pavements, Narrabri to Moree.

54.1Mb
May 2018 Aboriginal and historic archaeological survey report

Newell Highway Heavy Duty Pavements, Narrabri to Moree

12.9Mb
May 2018 Operational traffic and construction noise and vibration assessment report

Newell Highway Heavy Duty Pavements, Narrabri to Moree.

6.68Mb
May 2018 Urban design, landscape character and visual impact assessment report

Newell Highway Heavy Duty Pavements, Narrabri to Moree.

10.5Mb

 