Activity report

New, updated and withdrawn technical documents.

Updated technical documents

DateDocument referenceAmendment
25.03.21IC-DC-Q6 – Quality Management System (Type 6)Ed 1 Rev 3 Changes: 6th paragraph - wording changed to mirror that in the Construct Only version.
18.03.21IC-DC-R131 – Installation of Guide PostsEd 2 Rev 0 Changes: Updated to accord with base (non-D&C) Specification R131 Ed 5/Rev 0.
16.03.21Supplement to Australian Standard AS 1742.10-2009, Manual of Uniform Traffic Control Devices – Part 10: Pedestrian control and protectionVersion 3.1: The numerical warrants within the Supplement to AS 1742.10:2009, Manual of uniform traffic control devices, Part 10: Pedestrian control and protection have been reviewed in light of the concerns raised in relation to application and audience. The Supplement has been updated to provide greater clarity around the interpretation of the warrant and outlining that the intended audience of the Supplement is the State roads authority, as governed by the legislative functions of s.7 of the Roads Act 1993.
11.03.21IC-QA-3411 – Supply of Guide PostsEd 3 Rev 0 Changes: New edition, completely rewritten, combining previous specs 3411 and 3412. Clauses rearranged and reworded. Headings added to break long clauses into shorter subclauses. All references to "semi-flexible" guide posts deleted.
11.03.21IC-QA-R53 – Concrete for General WorksEd 3 Rev 5 Changes: Concrete parameters for concrete injected columns added to table. Annex M Referenced documents updated.
11.03.21IC-QA-R131 – Installation of Guide PostsEd 5 Rev 0 Changes: Spec title changed. References to spec 3142 removed, as spec 3412 is now combined with spec 3411. References to "semi-flexible guide posts" removed, to accord with spec 3411. Various clause changes.
11.03.21IC-QA-R225 – Concrete Injected ColumnsEd 2 Rev 0 Changes: Clauses rearranged and reworded to improve clarity. Various updates and amendments.
11.03.21IC-DC-3411 – Supply of Guide PostsEd 2 Rev 0 Changes: Updated to accord with base (non-D&C) Specification 3411 Ed 3/Rev 0.
11.03.21IC-DC-R53 – Concrete for General WorksEd 2 Rev 5 Changes: Updated to accord with base (non-D&C) Specification R53 Ed 3/Rev 5.
11.03.21IC-DC-R225 – Concrete Injected ColumnsEd 2 Rev 0 Changes: Updated to accord with base (non-D&C) Specification R225 Ed 2/Rev 0.
09.03.21IC-QA-TS200 – Register of ITS Field EquipmentEd 5 Rev 0 Changes: Updates to Annex A and B.
23.02.21IC-DC-TS101 – Traffic Signals - new installation and reconstructionEd 1 Rev 2 Changes: Updated to accord with base (non-D&C) Specification TS101 Ed 2/Rev 3.
22.02.21IC-QA-TS101 – New Installation and ReconstructionEd 2 Rev 3 Changes: Term "traffic control signals" and associated acronym changed to "traffic signals", various other updates and amendments to clauses.
17.02.21IC-QA-G2-C2 – General Requirements (Major Contracts)Ed 5 Rev 23 Changes: Concreting training requirements no longer applicable to Spec R81 "No Fines Concrete Subbase". Referenced documents updated.
17.02.21IC-QA-R81 – No Fined Concrete SubbaseEd 2 Rev 2 Changes: Requirements for concrete paving crew training to comply with Spec G2-C2 replaced by training in no fines concrete paving. Referenced documents updated.
17.02.21IC-QA-R82 – Lean-Mix Concrete SubbaseEd 4 Rev 4 Changes: Maximum size of fine aggregate no longer specified. Table 1 – Note (8) added. Table 2 - Note (4) added. Previous sub-clause on Concrete Paving Crew Training deleted (replaced by Clause 6.2). Subsequent sub-clause renumbered. New clause on concreting personnel requirements, including Grey Card Training. Hold Point added. Subsequent clauses renumbered. Schedule of Hold Points and Witness Points updated. Schedule of Identified Records updated. Planning Documents updated. Referenced documents updated.
17.02.21IC-QA-R83 – Concrete Pavement BaseEd 3 Rev 3 Changes: Reference to AS 2706 deleted. Approval of alternative combined particle size distribution by Principal instead of based on User Guide NR83. Fine aggregate to comply with AS 2758.1 and Table 2. Other requirements deleted. Various updates and amendments to clauses.
17.02.21IC-DC-R81 – No Fines Concrete SubbaseEd 2 Rev 2 Changes: Updated to accord with base (non-D&C) Specification R81 Ed 2/Rev 2.
17.02.21IC-DC-R082 – Lean-mix Concrete SubbaseEd 2 Rev 4 Changes: Updated to accord with base (non-D&C) Specification R82 Ed 4/Rev 4.
17.02.21IC-DC-R083 – Concrete Pavement BaseEd 2 Rev 4 Changes: Updated to accord with base (non-D&C) Specification R83 Ed 3/Rev 3.
15.02.21TSI-SP-041 – Luminaires For Road LightingIssue 2: Changes triggered by a Sydney Asset initiated review of IC-QA-R151 along with this specification (TSI-SP041) so that their interdependencies were aligned with each other, and coordinated by way of a Specification Review Committee (SRC) for Road Lighting and Tunnel and Underpass Lighting to oversee the changes. Numerous other changes and improvements.
15.02.21IC-QA-G22 – Work Health and Safety (Construction Work)Ed 6 Rev 4 Changes: Links to "Separate Yourself" Procedure and Guide added.
15.02.21IC-DC-G22 – Work Health and Safety (Construction Work)Ed 3 Rev 4 Changes: Updated to accord with base (non-D&C) Specification G22 Ed 6/Rev 4.
12.02.21Technical Directions Bridge BTD 2008/11 – Lists of Transport for NSW (TfNSW) Approved Bridge Components and SystemsChanges: Numerous updates and amendments.
09.02.21IC-QA-TS201 – Approval of ITS Field EquipmentEd 4 Rev 0 Changes: Director Intelligent Transport Systems changed to Director ITS Engineering following organisational changes in TfNSW.
09.02.21IC-QA-TS202 – Approval of ITS Solutions for ProjectsEd 4 Rev 0 Changes: Director ITS changed to Director ITS Engineering. Words "Policy and" removed from item 3.
03.02.21IC-QA-B80 – Concrete Work for BridgesEd 7 Rev 5 Changes: Testing of coarse aggregate for size < 2 µm added to reflect Item (e) in Clause 2.4.2.
03.02.21IC-QA-G7 – Utility AdjustmentEd 1 Rev 7 Changes: Previous sub-clause 8.1.2 on prequalification of traffic contractors deleted, as this is covered by spec TS101. Subsequent sub-clauses renumbered. Statement added that payment for adjustment work on traffic signals will be made under specs TS101 or G10 as appropriate.
03.02.21IC-DC-B80 – Concrete Work for BridgesEd 3 Rev 5 Changes: Updated to accord with base (non-D&C) Specification B80 Ed 7/Rev 5.
03.02.21IC-DC-G7 – Services Works (Utility Adjustment)Ed 1 Rev 6 Changes: Updated to accord with base (non-D&C) Specification G7 Ed 1/Rev 7.

Withdrawn technical documents

DateDocument referenceSummary
1103.21IC-DC-3412 Supply of Guide Posts (Non-Timber)

Incorporated into IC-QA-3411 – Supply of Guide Posts